Hand Tools. Tool Storage. Domestic Gas Forms. Non Domestic Gas Forms. Essential Forms and Pad Sets. Business and Construction Forms. Electrical Forms. Plumbing Forms. Carry Cases. Boulter Buderus. Heatline Spares. ICI Caldaie. Saunier Duval. Worcester Bosch. Control Box. Expansion Vessel. Oil Filters. Oil Gauges. Oil Lines. Photo Cells. Tiger Loops. DAB Pumps. Essential Forms and Pad Sets. Business and Construction Forms. Electrical Forms. Plumbing Forms. Carry Cases. Boulter Buderus. Heatline Spares.
ICI Caldaie. Saunier Duval. Worcester Bosch. Control Box. Expansion Vessel. Oil Filters. Oil Gauges. Oil Lines. Photo Cells. Tiger Loops. DAB Pumps. EPH Controls. Salamander Pumps. Stuart Turner. You are here: Home Boiler Manuals. Need some help? Call our friendly UK based support team on Boiler Manuals To view the associated documentation and manuals for your boiler, please select from a category below.
Ideal Classic NF Ideal Classic HE9, 12, 15, Ideal Classic 30NF. Ideal Classic 40NF. Side flue shown. Extension duct tube 1. A maximum of 2 extension ducts plus the standard flue duct may be used together.
Flue extensions of greater length than 1m 39" should be supported with the bracket provided. Remove the plastic plugs from the flow and Refer to Frame 2 for gas inlet service dimensions. A minimum pressure of 20 mbar MUST be available at the boiler inlet with the boiler operating. Some earth wires are omitted for clarity.
Ensure proper earth continuity when wiring. Numbering of terminals on thermostats is specific to the manufacturer. This is a fully controlled system - set the boiler thermostat to maximum.
The whole of the gas installation, including the meter, MUST be inspected and tested for soundness, and purged in accordance with the recommendations of BS. Checks to ensure electrical safety should be carried out by a competent person. Swing the control box back into its working position and secure. Remove the boiler casing. Refit the controls support to the boiler casing and tighten the 2 front fixing screws.
Refit the complete casing to the boiler. Clean the heat exchanger. Refer to Frame To ensure the continued safe and efficient operation of the appliance, it is recommended that it is checked at regular e. Clean the main and pilot injectors. Remove the 2 silicon rubber tubes from the fan sensing points.
Disconnect the fan leads. Rear flue Slacken the M4 screw securing the flue connector to the fan. Disconnect the connector from the fan and slide into the flue. If, after removing and checking the which quotes details of the rated output with the related injector as detailed in Frame 58 and ensuring that there is burner setting pressure and the heat input.
Remove the fixing screws B. Swing the control box down into the servicing position. Thermostat control 1. Pull the knob off the shaft. Remove the burner and air box assembly. Remove the electrode retaining nut. Remove the pilot shield. Remove the ignition electrode and integral lead.